Capacitive Membrane Switches
Engineered for precise touch and high durability. Custom-designed for medical and industrial applications with IP67 waterproof and backlit options.
100% Custom Layout
IP67 Waterproof
1 Million+ Cycles
LED Backlit Options
Fast Prototyping
Engineering Support
| Electrical Specifications | Mechanical Specifications | ||
|---|---|---|---|
| Working Voltage | ≤50V (DC) | Reliability Life | 1 million times |
| Working Current | ≤100mA | Rebound Time | ≤6ms |
| Contact Resistance | 0.5~10Ω | Close Displace | 0.1~1.0mm |
| Environmental & Material Specs | |||
| Working Temp | -20℃ ~ +70℃ | Materials | PET, PC, PMMA, Metal |
| Storage Temp | -40℃ ~ +85℃ | Adhesive | 3M, Nitto, Tesa |
Capacitive Membrane Switch Applications

Medical Equipment
Features a flat, completely sealed surface that is easy to sterilize and highly resistant to medical chemicals. Ensures precise input for diagnostic devices.

Industrial Control
Built for harsh factory settings. The IP67-rated structure effectively blocks dust, oil, and moisture, ensuring stable operation and long lifespan on control panels.

Smart Home
Offers flexible custom layouts and integrated LED backlighting. The low-profile design seamlessly integrates into smart appliances, providing an intuitive and modern user interface.

Automotive
Operates reliably across wide temperature ranges (-20℃ to +70℃). Withstands continuous vehicle vibrations, making it an ideal choice for interior electronic control panels.
Secure Export Packaging & Global Delivery

100% Final Inspection

Final Quality Check

Global Dispatch

Flexible Trade Terms
Frequently Asked Questions
Q1: What is your Minimum Order Quantity (MOQ) for custom membrane switches?
A: Our standard MOQ for mass production is typically 500 pcs. However, we fully support your R&D and prototyping phases, so we also accept small batch orders (e.g., 50-100 pcs) for initial testing and market validation.
Q2: What is the typical lead time for prototypes and mass production?
Prototypes/Samples: 7 to 10 working days.
Mass Production: 15 to 20 working days, depending on the order volume and material availability.
